Timeline: 6 Weeks

From Bureaucracy
To Bankability.

Legitimacy is an engineering problem. We don't need another study. We need a Proof Engine that turns FPI activity into DFI-grade assets.

The Visual Gap

International partners judge us in seconds. Currently, we signal "Procedure." We must pivot to signal "Power."

Today: Invisible ImpactLong texts, no verified data, administrative tone.
Tomorrow: The Proof CardVisual, metric-heavy, audited status (EBRD standard).

Administrative Report

Current Reality

FPI Impact Card

JOBS CREATED
+1,250
LEVERAGE
4.5x
DATA AUDITED BY KUMEA CORTEX
Target 2026

Drag slider to compare

The Solution: Proof Engine

We do not fix everything at once. We select 15 flagship projects and run them through this 3-step accelerator.

Data Mining

Excavation of 15 Flagship Projects

Refining

Transformation into 'Impact Cards'

Showcase

Expo 2026 'Deal Room' Deployment

Explore the Strategic Documents

Dive deeper into the methodology, execution plan, and strategic vision behind the FPI 2026 transformation.

Phase 0 Roadmap

4-6 Weeks to Expo Readiness

W1

Diagnosis

Selection of 15 Hero Projects

W2-3

Deep Dive

Data Verification & Asset Capture

W4

Packaging

Proof Deck & Blueprint Design

W5

Reveal

DG Validation & Cabinet Align

W6

Handover

Internal Team Training

Ready to Authorize the Mandate?

Approve Phase 0

© 2026 Kumea Africa. All Rights Reserved.
Kumea Cortex™ is a specialized division of Kumea Africa.
RCCM: CD/KNG/RCCM/24-B-01462 | IDNAT: 01-A0101-N49087K
Kinshasa, Democratic Republic of the Congo.